Preparations

REMODEL PREPARATIONS

Having work done on your home can be quick and painless, or it can be extensive. It all depends on what you are having done. For smaller projects, the preparation can be a simple:

  • Move furniture or other items away from where the handyman is going to be working before he gets there.
  • Make yourself available to answer any questions.
  • Keep kids and pets away from where the handyman is working. (Tools and materials can be dangerous or toxic.)

[call_to_action_bar title=”Remodeling Projects” desc=”What can I expect?”]
However, if you are preparing for a large home remodeling project, you may be feeling a bit nervous and anxious. Between the large expense and the excitement of anticipating your finished home, its hard not to feel concerned. Just make sure you clean out any cabinets and remove anything that is extremely valuable, or irreplaceable. While we do take every caution to protect your home and its contents, accidents can and do happen.

Here are a few other items to expect when taking on a remodel:

PreparationsDust. Even with elaborate visqueen and taping, a fine layer of dust can gather in parts of your home far from construction. Running air filtering systems called air handlers can also pull the dust from the air on the nonconstruction side of the house. Heat/Cooling the house without your HVAC if possible, or completely block the warm-air and cold-air returns in the construction area. If you don’t, you’ll just be pulling dust from that section of the house into the part where you’re living. Consult an HVAC company before blocking ducts to make sure your furnace will still work effectively.

Noise. It will be incessant. Whining saws, scratching Sheetrock sanders and thumping nail guns followed by bellowing compressors: in short, little peace or quiet. Find another place to nap and don’t count on working from home unless your home office is far away from the construction zone. If you’re sure it couldn’t possibly be that bad, visit someone else’s home under construction and you’ll see.

Preparations
Triumphant highs. For you it may be the demolition of the ugly vinyl floors in your kitchen. For others it may be the installation of the carefully selected backsplash tile. Others still may feel elated only when they see Sheetrock go in or get to relax when their project is completely done.

Multiple sighs. It may be that you just want to be done, or that you’re tired of answering so many questions and writing so many checks. Or you may just be tired of having so many people in your house. Hang in there — remodeling fatigue will be short lived when you get to move back into your newly remodeled space.

The unexpected. If you expect anything, expect this. Asbestos, irregular framing, jerry-rigged wiring, funny plumbing and more unexpected surprises are bound to arise. No, you won’t be laughing, and neither will your contractor. Count on finding something no one could have anticipated in your budget and your time frame, and you will be well prepared when it happens.

PreparationsChange orders. The unexpected’s cousin is the change order, by which any new and changed work is documented, along with added or reduced cost. Change orders can also be used to resolve allowances, which are placeholders in the budget for particular items. But most often change orders occur because of things that clients decide to add or change. When you absolutely positively have to have that Italian tile, you can bet a change order is on the way.

Cash concerns. Even if your project is right on budget, the sheer amount of money you are spending may cause a bit of a freakout. If you’re used to writing four-digit checks, you can easily be writing checks with one or two more zeros during a large remodel. If costs are increasing, along with change orders, it could increase your anxiety. Having cash on hand that’s a bare minimum of 10 percent above contract for contingencies will help alleviate that stress. Have 20 percent if you want to worry less.

Delays. Snow falls, people get sick, cars break down and sometimes faucets ordered from the factory take 10 weeks instead of six. You and your contractor will likely be working from a schedule that assumes the world is a perfect place. It’s not, and knowing that will allow you to be resilient when your schedule shifts a bit.

Preparations
Decisions. Where should that outlet be? How high do you want the showerhead? Where do you want the cabinet hardware mounted? Oil-rubbed bronze or chrome or brushed nickel or satin nickel? Is your head spinning yet? Count on hundreds of questions that you’ll need to answer as your project proceeds, or select your architect as your proxy. Just know that your selection of a contractor is the first of many you will make.

A party! Expect that you will want to show off your newly remodeled kitchen, living room or addition. We have had clients throw parties and invite friends, along with us and our trade partners. It’s gratifying for everyone to see a beautifully finished home filled with people enjoying themselves.

We found this list and it’s content on Houzz.com to be most helpful.